Karachi - Kathmandu
Flight / Schedule
Karachi - Kathmandu
Aircraft
Airbus A300Registration
AP-BCP
MSN
025
Year of Manufacture
1976
Date
September 28, 1992 at 02:30 PM
Type
CRASHFlight Type
Scheduled Revenue Flight
Flight Phase
Landing (descent or approach)
Crash Site
Mountains
Crash Location
Kathmandu Bagmati
Region
Asia • Nepal
Coordinates
27.6968°, 85.3217°
Crash Cause
Human factor
Narrative Report
On September 28, 1992 at 02:30 PM, Karachi - Kathmandu experienced a crash involving Airbus A300, operated by Pakistan International Airlines - PIA, with the event recorded near Kathmandu Bagmati.
The flight was categorized as scheduled revenue flight and the reported phase was landing (descent or approach) at a mountains crash site.
167 people were known to be on board, 167 fatalities were recorded, 0 survivors were identified or estimated. This corresponds to an estimated fatality rate of 100.0%.
Crew on board: 19, crew fatalities: 19, passengers on board: 148, passenger fatalities: 148, other fatalities: 0.
The listed crash cause is human factor. The ill-fated aircraft departed Karachi Airport Pakistan, at 0613 hours UTC on 28 September 1992 as Pakistan International Airlines Flight Number PK 268, a non-stop service to Kathmandu, Nepal. The accident occurred at 0845 UTC (1430 hours local time) when the aircraft struck a mountain during an instrument approach to Kathmandu’s Tribhuvan International Airport. The impact site was at an altitude of 7280 feet above sea level (2890 feet above airport level), 9.16 nautical miles from the VOR/DME beacon and directly beneath the instrument approach track from the VOR/DME beacon (9.76 nm from and 2970 ft above the threshold of Runway 02 which is 77 feet below the airport datum). The flight through Pakistani and Indian airspace appears to have proceeded normally. At 0825 hrs UTC (1410 hrs local time) two-way contact between Pakistan 268 and Kathmandu Area Control West was established on VHF radio and the aircraft was procedurally cleared towards Kathmandu in accordance with its flight plan. After obtaining the Kathmandu weather and airfield details, the aircraft was given traffic information and instructed to report overhead the SIM (Simara) non-directional beacon (214°R VOR/39 nm from Kathmandu’s KTM VOR/DME) at or above FL150 (flight level on standard altimeter) as cleared by the Calcutta Area Control Centre. At 08:37 hrs the copilot reported that the aircraft was approaching the SIM beacon at FL 150, whereupon procedural clearance was given to continue to position SIERRA (202°R/10 nm from the KTM beacon) and to descend to 11,500 feet altitude. No approach delay was forecast by the area controller and the co-pilot correctly read back both the clearance and the instruction to report at 25 DME. At 08:40:14 hrs, he reported that the aircraft was approaching 25 DME whereupon the crew were instructed to maintain 11,500 feet and change frequency to Kathmandu Tower. Two-way radio contact with the Tower was established a few seconds later and the crew reported that they were in the process of intercepting the final approach track of 022M (Magnetic) of Radial 202 KTM VOR ) They were instructed to expect a Sierra approach and to report at 16 DME. At 08:42:51 hrs the first officer reported “One six due at eleven thousand five hundred”. The tower controller responded by clearing the aircraft for the Sierra approach and instructing the crew to report at 10 DME. At 08:44:27 the first officer reported 10 DME and three seconds later he was asked, “Report your level”. He replied, “We crossed out of eight thousand five hun,’ two hundred now”. The controller replied with the instruction “Roger clear for final. Report four DME Runway zero two”. The copilot responded to this instruction in a normal, calm and unhurried tone of voice; his reply was the last transmission heard from the aircraft, thirty-two seconds after the copilot reported 10 DME the aircraft crashed into steep, cloud-covered mountainside at 7,280 feet amsl and 9.16 nm on radial 202 of KTM VOR. All 167 occupants were killed.
Aircraft reference details include registration AP-BCP, MSN 025, year of manufacture 1976.
Geospatial coordinates for this crash are approximately 27.6968°, 85.3217°.
Fatalities
Total
167
Crew
19
Passengers
148
Other
0
Crash Summary
The ill-fated aircraft departed Karachi Airport Pakistan, at 0613 hours UTC on 28 September 1992 as Pakistan International Airlines Flight Number PK 268, a non-stop service to Kathmandu, Nepal. The accident occurred at 0845 UTC (1430 hours local time) when the aircraft struck a mountain during an instrument approach to Kathmandu’s Tribhuvan International Airport. The impact site was at an altitude of 7280 feet above sea level (2890 feet above airport level), 9.16 nautical miles from the VOR/DME beacon and directly beneath the instrument approach track from the VOR/DME beacon (9.76 nm from and 2970 ft above the threshold of Runway 02 which is 77 feet below the airport datum). The flight through Pakistani and Indian airspace appears to have proceeded normally. At 0825 hrs UTC (1410 hrs local time) two-way contact between Pakistan 268 and Kathmandu Area Control West was established on VHF radio and the aircraft was procedurally cleared towards Kathmandu in accordance with its flight plan. After obtaining the Kathmandu weather and airfield details, the aircraft was given traffic information and instructed to report overhead the SIM (Simara) non-directional beacon (214°R VOR/39 nm from Kathmandu’s KTM VOR/DME) at or above FL150 (flight level on standard altimeter) as cleared by the Calcutta Area Control Centre. At 08:37 hrs the copilot reported that the aircraft was approaching the SIM beacon at FL 150, whereupon procedural clearance was given to continue to position SIERRA (202°R/10 nm from the KTM beacon) and to descend to 11,500 feet altitude. No approach delay was forecast by the area controller and the co-pilot correctly read back both the clearance and the instruction to report at 25 DME. At 08:40:14 hrs, he reported that the aircraft was approaching 25 DME whereupon the crew were instructed to maintain 11,500 feet and change frequency to Kathmandu Tower. Two-way radio contact with the Tower was established a few seconds later and the crew reported that they were in the process of intercepting the final approach track of 022M (Magnetic) of Radial 202 KTM VOR ) They were instructed to expect a Sierra approach and to report at 16 DME. At 08:42:51 hrs the first officer reported “One six due at eleven thousand five hundred”. The tower controller responded by clearing the aircraft for the Sierra approach and instructing the crew to report at 10 DME. At 08:44:27 the first officer reported 10 DME and three seconds later he was asked, “Report your level”. He replied, “We crossed out of eight thousand five hun,’ two hundred now”. The controller replied with the instruction “Roger clear for final. Report four DME Runway zero two”. The copilot responded to this instruction in a normal, calm and unhurried tone of voice; his reply was the last transmission heard from the aircraft, thirty-two seconds after the copilot reported 10 DME the aircraft crashed into steep, cloud-covered mountainside at 7,280 feet amsl and 9.16 nm on radial 202 of KTM VOR. All 167 occupants were killed.
Cause: Human factor
Occupants & Outcome
Crew On Board
19
Passengers On Board
148
Estimated Survivors
0
Fatality Rate
100.0%
Known people on board: 167
Operational Details
Schedule / Flight
Karachi - Kathmandu
Flight Type
Scheduled Revenue Flight
Flight Phase
Landing (descent or approach)
Crash Site
Mountains
Region / Country
Asia • Nepal
Aircraft Details
Similar Plane Crashes
Royal Air Force - RAF
Douglas C-47 Skytrain (DC-3)
After touchdown, the aircraft encountered difficulties to stop. It overran and went down and embankment before coming to a halt. While the aircraft was destroyed, all 16 occupants were rescued.
Kalinga Airlines
Douglas C-47 Skytrain (DC-3)
During the takeoff run, the captain saw a man crossing the runway and decided to liftoff asap. He pulled on the control column and the aircraft rotated quickly. Unfortunately, the aircraft's speed was too low and it stalled before crashing few dozen yards farther. Two crewmen were killed while a third one was seriously injured. The aircraft was destroyed.
Pakistan International Airlines - PIA
Douglas C-47 Skytrain (DC-3)
The aircraft took off at 0820 hours West Pakistan Standard Time from Chaklala aerodrome on a charter flight to Gilgit. After landing at 1014 hours at Gilgit, the captain advised the passengers and ground staff that he would not carry passengers on the return flight due to the very bad weather conditions en route. At 1400, AP-ACZ departed Gilgit on the return flight and at 1410 was in wireless telegraphy communication with Gilgit aerodrome. At 1421, Chaklala passed on to the aircraft the latest MET observation and the transmission was acknowledged. Nothing further was heard from the aircraft until 1454 when the following SOS was picked up by the ground stations and two other aircraft: 'SOS APACZ INDUS mouth position trapped in bad weather, Indus mouth. Chaklala aerodrome acknowledged the SOS but failed to contact the aircraft. The flight crashed on the peak of Lash Golath mountain at a height of approximately 14,000 to 15,000 feet. All three crew members, the sole occupants, were killed.
Indian Airlines
Douglas C-47 Skytrain (DC-3)
The landing at Kathmandu-Tribhuvan was completed at an excessive speed. On touchdown, the aircraft bounced several times before landing firmly. After few dozen yards, the pilot-in-command added power in an attempt to go around when the airplane overran and crashed into a ravine. Nineteen occupants were injured while 14 others plus one person on the ground were killed.
Pakistan International Airlines - PIA
Douglas C-47 Skytrain (DC-3)
After takeoff from Chittagong Airport, the airplane went out of control, went into a spin and crashed into the sea four km off the Charlakhi Island. All 24 occupants were killed. At the time of the accident, weather conditions were poor with thunderstorm activity.
Indian Airlines
Douglas C-47 Skytrain (DC-3)
The crew started the descent to Kathmandu in poor weather conditions when the airplane crashed on a mountainous area located about 20 km from the airport. Following a navigational error on part of the pilots, the airplane followed a wrong approach path to Kathmandu Airport and went into the wrong valley. At the last moment, the pilot-in-command made a sharp turn to avoid the mountain but the aircraft stalled due to an insufficient speed and crashed on a rocky slope. The aircraft was destroyed upon impact and all 20 occupants have been killed.
